Sample Report

TITLE:

PROGRESS REPORT #1

DATE:

10/5/2000

PROJECT:

Mr. And Mrs. Sample Report
RESIDENCE

JOB:

JOB01
 
WORK ACCOMPLISHED
THROUGH :   10/20/2000:
WORK ANTICIPATED
THROUGH :  10/31/2000
  1. Pool deck steps formed.
  2. Kitchen exhaust hood installed.
  3. Interior bar tops installed.
  4. X
  5. X
  6. X
  7. X
  8. X
  9. X
  10. X
  11. X
  12. X
  13. X
  14. X
  15. X

 

  1. Garage doors installed.
  2. Roof-access deck tile completed.
  3. Kitchen back-splash tiled and grouted.
  4. X
  5. X
  6. X
  7. X
  8. X
  9. X
  10. X
  11. X
  12. X
  13. X
  14. X
  15. X